Rockhaven Reports

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option
Preliminary Scope of Work: Historic Resource Report for Rockhaven Sanitarium

Goals, Historic Context Report, Existing Condition Survey (Architectural Assessment & Landscape/Hardscape/Cultural Landscape, Assessment), Drawings, Recommended Work

Download Preliminary Scope of Work

Inventory of Interiors

Download Inventory of Interiors

Topographical Map (8-13-07)

Download Topographical Map

Public Works - Facilities Services Rockhaven Sanitarium Building Assessment Report (3-26-08)

"At the request of the Director of Public Works, the Facilities Services section inspected the buildings and structures at the Rockhaven Sanitarium in order to determine the integrity of the following systems: Structural, Electrical, Plumbing and HVAC (Heating, Ventilating, Air Conditioning). In addition, any observed Environmental and Safety hazards were noted on the report." (pg. 2)

Download Building Assessment Report

Asbestos & Lead Survey Report (3-31-08)

Download Asbestos & Lead Survey Report

Update for Parks, Recreation and Community Service Commission (7-2-08 Meeting)

Download Update

Free viewers are required for some of the attached documents.
They can be downloaded by clicking on the icons below.

Acrobat Reader Download Acrobat Reader Windows Media Player Download Windows Media Player Word Viewer Download Word Viewer Excel Viewer Download Excel Viewer PowerPoint Viewer Download PowerPoint Viewer