South Verdugo Road Multi-Modal Improvements Project

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Project Location

  • The project location is on South Verdugo Road between Colorado Boulevard and Southerly City limits. Please see project location map below.

Exhibit 1 - S Verdugo Rd PL Map_page-0001

Scope of Work

  • Selective removal/reconstruction of deteriorated pavement and placement of asphalt concrete pavement
  • Resurfacing of street pavement
  • Selective removal, repair, and reconstruction of approximately of damaged curbs and gutters, sidewalks, driveways, cross gutters, alley aprons, and local depressions
  • Construction and modification of curb ramps to meet ADA guidelines
  • Upsize of sanitary sewer main line, sanitary sewer repairs and lining
  • Adjustment of existing manholes, utility valves, and water meters to finished grade
  • Planting of new street trees
  • Removal and replacement of existing traffic striping and pavement markings
  • Installation of bicycle friendly catch basin surface grates and connector pipe screens (CPS) units
  • Installation of creative crosswalks
  • Installation of new bicycle facilities, and
  • Traffic Signal Modifications at the following intersections
    • South Verdugo Road and Colorado Boulevard
    • South Verdugo Road and E. Maple Street
    • South Verdugo Road and Acacia Avenue

Phase

  • The Project is currently in the design phase.

Community Outreach and Stakeholder Engagement

  • Check back at the start of the project!

 Construction Schedule 

  • Construction is tentatively scheduled to start in 2025.

Construction Updates

  • Check back at the start of the project!

Traffic Impacts

  • Check back at the start of the project!
  • Check back at the end of the project!

Construction Photos

  • Check back at the start of the project.

Contact Information

  • Public Works Engineering: (818) 548-3945
  • Public Works Project Manager: Rustom Tavitian, P.E.; Email