Specification No. 3890
Location and Limits
- View Crest Road from Glen Aire Drive to Easterly Terminus
Project Location
Project Description
The general scope of the work includes:
- Slope repair on the northerly side of View Crest Road through installation of pile wall system (steel H-pile with precast concrete lagging);
- Removal of the existing pavement and base and re-grading the roadway to direct the flow toward southerly side of View Crest Road;
- Installation of asphalt concrete pavement over crushed miscellaneous base;
- Installation of concrete curb and gutter along the southerly side of View Crest Road to contain the flow and retain the sloughing slope soils;
- Installation of concrete curb along the northerly side of View Crest Road;
- Removal of existing damaged guardrails and installation of new Midwest Guard Rail (MGS) system with steel posts;
- Adjustment of existing manholes, utility valves, and water meters to finished grade;
- Installation of new traffic signing, striping, and pavement markings; and
- Removal and planting of various trees, shrubs, and ground cover along the slope to improve erosion control.
Phase
- Design
Current Status
- The project is currently in design phase.
Construction Schedule
- Estimated Construction Start Date: Fall 2024
- Estimated Construction Completion Date: Spring 2025
Traffic Impacts
- Check back at the start of the project!
Construction Photos
- Check back at the start of the project!
Community Meetings
- Check back at the start of the project!
Contact Information
- Public Works Engineering: (818) 548-3945
- Public Works Project Manager: Viktoriya Pakhanyan, Email